Rail Battery Workshop Report

1. Cover
2. Tooling
3. Inspection
4. Photos
5. Discharge
6. Charge
7. Capacity
8. Final Charge
9. Conclusion

Battery Details

Crate Serial Numbers

Section 1 — Tooling

Enter the tooling used during this maintenance. All tooling checked for serviceability and calibration prior to use.

DescriptionTool NumberNext Calibration Due

Section 2.1 — Initial Inspection

Section 2.3 — Arrival Photos

📷 Click to upload arrival photos

JPG, PNG accepted

Section 2.4 — Data Plates

📷 Click to upload data plate photos

Section 2.5 — Post-Cleaning Photos

📷 Click to upload post-cleaning photos

Section 2.2 — Discharge Figures

Import the discharge recording CSV from the charge/discharge equipment. Cell readings populate automatically — manual entry is disabled.

No file imported yet.

Section 3.1 — Charge Figures

No file imported yet.

Section 3.2 — Capacity Check

Discharge at 0.2 C5A (75A) down to 20V. Acceptance: battery capacity > 80% of rated (300 Ah).

No file imported yet.

Section 3.3 — Capacity Calculations

— %
Capacity achieved

Result

Section 4.1 — Final Charge Figures

No file imported yet.

Section 4.3 — Conclusion

Overall Result

Remaining Capacity Measurement: %

Section 4.2 — Post-Maintenance Photos

📷 Upload post-maintenance photos

Technician Sign-off